露脸丨91丨九色露脸 I 国产成人精品午夜福利a I 欧美日韩一区二区三区69堂 I 色琪琪av中文字幕一区二区 I 日韩欧美特级片 I 精品国产一区在线 I 午夜在线91 I 亚洲男人的天堂一区二区 I 日日操夜夜揉 I 国内精品国产三级国产在线专 I 春色校园亚洲愉拍自拍 I 中文在线8新资源库 I av日韩网 I 亚洲综合一区二区 I 一级成人av I av不卡网 I 色视频在线免费看 I 潮喷大喷水系列无码 I 91色国产在线 I 国产a一区 I 欧美肥老太牲交视频 I 高hnp多人 I 亚洲欧洲成人精品av97 I 国产精品国产高清国产av I 性欧美老人牲交xxxxx视频 I 国产精品嫩 I 欧美成人dvd在线视频 I 国产精品美女久久久9999 I 美女极度色诱视频 I 亚洲成人黄色小说 I 日韩女同在线 I 九色精品免费永久在线 I 亚洲图片 制服诱惑 I 亚洲国产日韩美 I 亚洲精品电影久久久

Shandong Tianyu Construction Machinery CO.,LTD.
Add:Qihe Economic Development Zone, Shandong Province
Tel:+86-534-5678900
Fax:+86-534-8997399
E-mail:tyjsjx2002@163.com
Postcode:251100
WebSite:http://www.bykm.com.cn
Alibaba:https://sdtyjx.en.alibaba.com
Industry information

Daily maintenance of concrete mixing building station in winter

Daily maintenance of concrete mixing building station in winter

1. Before starting the machine, the air in the control room should be turned on for about half an hour. After the indoor temperature is raised, the industrial computer and electrical equipment are started.

2. After the construction of the mixing station is completed on the same day, the water pump, drain pump and water metering equipment should be drained to prevent frost cracking pipelines and pump bodies and valves.

3. When the temperature is lower than zero degrees Celsius, the aggregate conveying belt is used to reduce the weight or adjust the tail adjustment lever to relax the belt, so that the belt does not slip.

4. The admixture will crystallize when the ambient temperature reaches zero, and will change from liquid to semi-flow state. Before each start-up, the admixture device should be opened first, and the admixture should be evenly stirred and then turned on to prevent the pump from burning out due to idling. seal.

5. Drain the air compressor, gas storage tank, triplet, etc. to prevent freezing.

6. After each construction of the mixing station, the remaining materials of the gravel silo should be emptied to prevent the ice from affecting the next normal use.

7. The gear oil of each reducer should be replaced; check the scraper plate of the replacement belt; it is recommended to use 1# or 2# lithium base grease to prevent the oil supply pipe from being blocked.